Posts

Showing posts from February, 2023

Prairie River Bridge | End Details

Image
This article has been moved to the N Scale Workshop ...

February 2023 Crossing Gate Editorial

Image
From the Workbench of the Assistant Superintendent My name is Randi Relander, and I am currently your division assistant superintendent. This is my first editorial for “The Crossing Gate” so let me start out by welcoming all the new members who have joined the division lately. Looking around, I find it humbling to be associated with such a talented crew and am looking forward to where the division is headed. For those who don’t know me, and even those that do, here is my story. I was born in Grand Rapids, MN in 1964 and grew up in a “suburb” of Babbitt, MN, about 50 miles straight north of Duluth, at the end of the iron range where my dad worked as a truck driver for Reserve Mining. We lived in a small trailer house on the edge of a swamp outside of town and I slept in the front room until my sister moved out in 1976 and I inherited her 8’ x 8’ bedroom. Shortly after, I became interested in model railroading and started reading everything I could on the subject, eventually building an

Prairie River Bridge | End Braces

Image
This article has been moved to the N Scale Workshop ...